Build log
Inside a build
Checked and photographed
Every box is opened, every part checked against the spec and photographed with its serial number.
One builder, start to finish
Processor, memory and storage on the board, then into the case.
Routed and tied
Every cable routed behind the tray and tied, so air flows and upgrades are easy.
Twelve hours hot
Full load on processor and graphics for twelve hours. Temperatures, clocks and errors logged.
Log and recovery drive
Delivered with the burn-in log, the spec sheet and a recovery drive.
The lab
From a desk to a bench
2018
One desk
Builds for friends from a desk in Ikeja.
2020
The shopfront
A small shop on Allen Avenue.
2023
The burn-in rack
A rack for twelve-hour tests, six machines at a time.
2026
Three builders
Workstations for studios across Lagos.
Example dates for this demo store.